Navis completes contract for largest Netherlands superyacht

Jet set, Marinas, Maritime Tourism, News, Yachting — By on October 22, 2013 at 2:53 PM
The "Madame Gu"

The “Madame Gu”

Navis Engineering has successfully concluded a contract to supply a dynamic positioning (DP) system to the largest superyacht to be constructed in The Netherlands, the 99m Madame Gu.

Built at Feadship in steel and aluminium over the course of a four-year period, the superyacht is powered by four MTU 20v diesel engines and can reach a maximum speed of 24 knots. It has a beam of 13.6m, a maximum draught of 4.6m, is classed by Lloyd’s Register and is MCA compliant.

Madame Gu‘s particular features include accommodation for up to 12 guests in six state rooms including a master state room and five guest cabins. The vessel also carries a crew of 36, sleeping in 18 crew cabins. Special amenities include a fully enclosed helicopter hangar, two 11m yacht tenders and scuba gear.

Madame Gu has a beam of 13.6m and a maximum draught of 4.6m. Classed by Lloyd’s Register, the vessel is MCA compliant.

About Navis Engineering

Navis Engineering Oy, founded in 1992, is a privately owned Finnish manufacturer of dynamic positioning and vessel motion control systems. The company headquarters is located in Vantaa, Finland, where production takes place, while it also has a R&D Centre in St Petersburg, Russia.

Tags:

Leave a Reply

IMPORTANT! To be able to proceed, you need to solve the following simple math (so we know that you are a human) :-)

What is 7 + 9 ?
Please leave these two fields as-is:

Trackbacks

Leave a Trackback