Hot Port News from GAC

Inland Waterways, Port Conditions, Ports & Terminals, Safety and Security — By on November 28, 2017 at 7:08 PM

28-Nov-2017

CLOSURES FOR MAT SINKING OPS
Lower Mississippi River, United States
Closures for mat sinking ops
Tuesday, November 28, 2017, Lower Mississippi River, United States
The United States Army Corps of Engineers (USACE) is conducting mat sinking operations near the HPL Bridge at MM105.8, AHOP. There will be intermittent closures of the main navigation span of the HPL Bridge.

During the closures, all vessels must use the alternate navigation span. Additionally, all vessels will be restricted to one-way transit of the bridge.

The alternate navigation span has a vertical clearance of 144.0 feet less the Carrollton Gauge.

As of 0600 yesterday (27 November), the Carrollton Gauge read 5.36 feet. Therefore, the vertical clearance of the alternate span is 144.0 – 5.36 + 138.64 feet or 42.25 meters.

Effective dates and times of closures: November 27-28 from 0600 to 1900 hours local time.

For information about operations in the United States contact GAC USA at usa@gac.com

Tags: , , ,

Leave a Reply

IMPORTANT! To be able to proceed, you need to solve the following simple math (so we know that you are a human) :-)

What is 13 + 5 ?
Please leave these two fields as-is:

Trackbacks

Leave a Trackback